Scope of Service

• Review and analysis reference;

• Analysis and study of meteo-hydrology

• Field Surveys (Topographical survey, Geological investigation, Survey of hydrology, Sampling & data

    collection for     environmental studies, Survey of electrical system & transmission);

• Basin development studies;

• Optimization and development scheme studies for hydroelectric power plant site selection;

• Preliminary design main structure for hydroelectric power plant;

• Preparation of project work schedule, including: (Feasibility study, Basic design; Preparation of tender

   documents;     Tender; Construction work)

• Environmental study of socio economy impact;

• Project economy analysis