Call Us On
62217654034
PT. Amythas
Objective of the project are prepare the dam rehabilitation design and dam basic safety facilities of Muer, Tiu Kulit, Kengkang, Kempo, Olat Rowo, Bayan, and Pemasar Dam. Consultant will especially be responsible in: Data collecting related with dam and its capacity; Evaluation and analysis of inspection report conducted by dam safety bureau; Propose the remedial work improvement as material discussion; Conduct survey and hydrological analysis; Conduct topographic survey and mapping; Conduct geotechnical investigation; Prepare dam rehabilitation design and dam basic safety facilities; Cost estimate and tender document preparation.